Guides / Telok Blangah Beacon key collection

Telok Blangah Beacon key collection: a defect check plan for your flat

Updated 2026-11-21

Telok Blangah Beacon is a small BTO in Bukit Merah: one 38-storey block along Telok Blangah Drive, launched in the May 2021 BTO exercise with 175 3-room and 4-room flats. HDB's estimated completion was early 2027, but in November 2026 the BTOHQ tracker showed the block at about 76% built, so keys may come later than first hoped. Your own HDB letter is the date that counts. Here's how to plan your first visit so you don't miss anything.

The deadline that matters

Report defects to your Building Service Centre (BSC) within one month of collecting your keys, and before your renovation starts. The 12-month defects liability period (DLP) covers problems that show up later, but the first month is when it's easiest to show a defect was there from day one. If your renovation contractor wants to start the week you get keys, do your check first.

One tall block: compare notes with your stack

All 175 households share one block, and flats in the same stack have the same layout one above the other. That makes your neighbours a good early warning.

High floors: windows and rain

At up to 38 storeys, many flats here sit well above the surrounding blocks. Wind-driven rain hits high-floor windows harder, so give them extra time.

More in how to check windows at key collection.

3-room or 4-room: plan your time

Listings give the 3-room flats as about 69 sqm and the 4-room flats as about 92 sqm. Allow about an hour and a half for a 3-room and two hours or more for a 4-room, in daylight. Bring a second person if you can: one taps and tests, the other tapes and takes photos.

Getting there and what to bring

Telok Blangah MRT on the Circle Line is the closest station, a short walk away, and there's a FairPrice nearby if you need water or tape on the day. Pack painter's tape, a marker, a coin, a bottle of water for the drain test, and a charged phone. Full list: what to bring on key collection day.

A simple plan for the first visit

  1. Go room by room. In each room: floor, walls, ceiling, doors, windows, sockets, then anything with water. Finish one room before moving on.
  2. Number each defect on tape (#01, #02…), then take one close-up and one wide photo with the number showing. The BSC uses the numbers to find each spot.
  3. Mark them on a floor plan. A quick sketch with the numbers on it saves the contractor time and saves you a second visit.
  4. Write one clean list, grouped by room, and submit it within the month. Check the repairs when they're done and report anything that wasn't fixed.

Every room and what to check is in the room-by-room BTO defect checklist. Prefer paper? There's a free printable version with tick boxes and number labels. Or use the free KeyDay app on your phone: it numbers each defect, keeps the photos with it and marks it on your floor plan. How to hand the list in: how to report BTO defects to the BSC.

After the first month

Tiles can turn hollow and hairline cracks can appear over the first year. Do a second round before the 12 months are up: the one-year DLP check. Renovating? Check the contractor's work before the final payment with the renovation handover checklist.

Another single-block project with keys around now: the Kent Heights check. All projects: the full BTO key collection list.

More guides for new homeowners →