Guides / Kent Heights key collection

Kent Heights key collection: a defect check plan for your flat

Updated 2026-11-03

Kent Heights is the single-block BTO on Owen Road in Kallang/Whampoa, near Farrer Park MRT. It was launched in the November 2021 BTO exercise with 430 flats in one 32-storey block: 154 2-room Flexi flats and 276 4-room flats, served by an 8-storey multi-storey car park. HDB's estimated completion was the fourth quarter of 2026, and BTO trackers now show December 2026, so key collection letters should be close. Your own HDB letter is the date that counts. Here's how to check your flat properly on the first visit.

The deadline that matters

Report defects to your Building Service Centre (BSC) within one month of collecting your keys, and before your renovation starts. The 12-month defects liability period covers problems that appear later, but the first month is when it's easiest to show a defect was there from the start.

One block: compare notes with your stack

Everyone at Kent Heights lives in the same block, and flats in the same stack share the same layout, one above the other. That makes your neighbours useful. If the unit above or below you finds a water stain in the same corner or a window that won't seal, it's worth looking at the same spot in your flat.

2-room Flexi: a quick check, but which type?

There are 30 Type 1 flats (about 38 sqm) and 124 Type 2 flats (about 48 sqm). Type 2 has a flexible space that can be used for dining, entertainment or a live-in caregiver. Small flats don't take long: give yourself about an hour, in daylight.

4-room: plan your time

The 4-room flats here are about 92 sqm. Give yourself two hours or more, and bring a second person if you can: one taps and tests, the other tapes and takes photos.

Windows: which side are you on?

The Central Expressway (CTE) runs along the north side of the site. Launch reviews noted the car park sits on that side and may help as a noise buffer, while the south side faces the Kent Ville blocks. Either way, close and lock every panel, look for gaps or loose rubber seals, and check the sealant around the frame. On the higher floors, rain gets blown hard against the glass, so photograph any water marks on the sill or the wall below. Don't lean out to check the outside of the frame. More in how to check windows at key collection.

Getting there and what to bring

Farrer Park MRT on the North East Line is about a 12-minute walk. Pek Kio Market and Food Centre is right by the site if you need lunch or a break, and there's a FairPrice a few minutes away. Pack painter's tape, a marker, a coin, a bottle of water for the drain test, and a charger. Full list: what to bring on key collection day.

A simple plan for the first visit

  1. Go room by room. In each room: floor, walls, ceiling, doors, windows, sockets, then anything with water.
  2. Number each defect on tape (#01, #02…), then take one close-up and one wide photo with the number showing. The BSC uses the numbers to find each spot.
  3. Mark them on a floor plan. A quick sketch with the numbers on it saves the contractor time and saves you a second visit.
  4. Write one clean list, grouped by room, and submit it within the month. Check the repairs when they're done and report anything that wasn't fixed.

Every room and what to check is in the room-by-room BTO defect checklist. Prefer paper? There's a free printable version with tick boxes and number labels. Or use the free KeyDay app on your phone: it numbers each defect, keeps the photos with it and marks it on your floor plan. How to hand the list in: how to report BTO defects to the BSC.

After the first month

Tiles can turn hollow and hairline cracks can appear over the first year. Do a second round before the 12 months are up: the one-year DLP check. Renovating? Check the contractor's work before the final payment with the renovation handover checklist.

Also collecting keys in Kallang/Whampoa around now: the Towner Residences check. All projects: the full BTO key collection list.

Do the whole check on your phoneKeyDay walks you room by room, numbers each defect to match your tape, and builds a PDF report with photos and a labelled floor plan for your BSC or contractor. Free, no sign-up, no payment.Try KeyDay free

More guides for new homeowners →