Guides / Sockets, switches and the circuit breaker

How to check the sockets, switches and circuit breaker in your new BTO flat

Updated 2026-10-21

Most people spend key collection tapping tiles and looking at walls. The electrical points get a quick glance at best. But a dead socket, a switch that controls the wrong light or a cracked cover plate is much easier to get fixed by HDB now than after your contractor has built a TV console or a wardrobe in front of it.

This check takes about 20 minutes for a 4-room flat. You don't need to be an electrician. You only plug things in, flick switches and look. Never open a socket, switch or the inside of the distribution board yourself: electrical work in Singapore must be done by a Licensed Electrical Worker.

Before you go

1. Every socket, in every room

Go room by room and test every socket, including the ones you'd forget: behind where the fridge will go, in the service yard, along the kitchen counter and low down behind doors. For each one:

  1. Plug in your charger or tester. Switch the socket on and check it works.
  2. Switch it off and check it stops. A socket that stays live when switched off is a defect.
  3. With a socket tester, read the lights against the chart on the tester. Anything other than "correct" (for example missing earth or reversed wires) goes on your list.
  4. Look at the plate. Is it cracked, chipped, crooked or not flush with the wall? Does it move when you pull out the plug? A loose socket is worth reporting.

2. Every switch and light point

3. The water heater, aircon and other points

Find the water heater switch (usually a bigger switch outside the bathroom) and any aircon isolator points. Check the switch plates are intact and fixed firmly. Also look at the telephone, data and TV points, and the doorbell if your flat has one. You can't fully test data points without a service, but you can still check the plates are complete, straight and not damaged.

4. The distribution board (DB box)

Open the outer cover of the DB box only. Don't remove any inner panels.

The RCCB test

The residual current circuit breaker (RCCB) cuts the power if it detects unsafe current leakage. Singapore's Consumer Product Safety Office suggests testing it every month, and key collection is a good time to do the first one:

  1. Press the test button on the RCCB.
  2. The RCCB should trip and the power should go off.
  3. Switch it back on.

If it doesn't trip, report it to the BSC straight away. Once you've moved in and it's outside HDB's coverage, contact a Licensed Electrical Worker.

How to record what you find

Then report everything together with your other defects to your project's Building Service Centre. Our guide on how to report BTO defects to the BSC explains the steps.

Before renovation starts

Check the electrical points before your contractor starts work, and report defects first. Once a contractor has moved or added points, it can be hard to show a fault was there from the start. Your contractor's own electrical work is their responsibility, so check it again at handover: our renovation handover checklist covers that.

Quick checklist

For everything else to check in each room, see the room-by-room BTO defect checklist.

Do the whole check on your phoneKeyDay walks you room by room, numbers each defect to match your tape, and builds a PDF report with photos and a labelled floor plan for your BSC or contractor. Free, no sign-up, no payment.Try KeyDay free

More guides for new homeowners →