New flat move-in checklist (Singapore): everything to set up before and after you move in
Moving into a new flat means a long list of small jobs, and a few of them have deadlines. Here's the list in the order most people need it.
Before key collection
- Open your utilities account (electricity, water and gas) with SP Services so the power and water are on when you collect your keys. If you want to buy electricity from a retailer instead, you can switch later.
- Plan your first visit: bring painter's tape, a marker, a coin, a bottle of water and a phone charger for the defect check. See what to bring on key collection day.
- Book your internet early. Installation slots can take a week or two.
Week 1 after key collection
- Photograph the electricity and water meter readings on day one.
- Do your defect check before anything is delivered or installed: room-by-room BTO defect checklist.
- Test every key, letterbox key and access card.
- Put two dates in your calendar: the end of your one-month defect reporting window, and the end of your one-year defects liability period, so you can do a second check before it ends.
Before renovation starts
- Submit your defect list to the Building Service Centre within the first month, and before renovation starts.
- Take "before" photos of every room, so you can show what was there before the contractor started.
- Follow HDB's renovation guidelines and make sure your contractor applies for any permits your works need.
- Check the work before the final payment: renovation handover checklist.
Moving week
- Update your address on your NRIC with ICA after you move in. Check ICA's website for the current deadline and how to do it online.
- Update your address with your bank, insurers, employer, CPF and anyone who sends you mail.
- Set up payment for your service and conservancy charges (S&CC) with your Town Council.
- Service the aircon before you start using it heavily, especially after renovation dust.
- Clean the window tracks, floor traps and cabinets after the renovation cleaning; dust and debris hide there.
Things people forget
- Keep every warranty card, manual and receipt in one folder (or one phone album).
- Label the breakers in your distribution board if they aren't labelled.
- Know where the water stop valve is before you need it.
- Keep a few spare tiles from your renovation for future repairs.
KeyDay Kit is our free phone app for the defect checks on this list: room by room, numbered defects with photos, and reminders for both deadlines. Try it free.
Do the whole check on your phoneKeyDay walks you room by room, numbers each defect to match your tape, and builds a PDF report with photos and a labelled floor plan for your BSC or contractor. Free, no sign-up, no payment.Try KeyDay free